Saturday, March 27, 2010
Silver Lake...The snow is Almost GONE!
This is the first time we had been able to drive down the road since last fall. Since our home was the furtherest one being built this past winter we decided to only have the road plowed to our driveway. There are two other homes before our that are also in the process of being built. So the cost is going to be divided three ways. You can see the other home right above the white trailer in the picture.

So the contruction crew continues in the MUD getting ready to built the walkway deck on the West side of our home.
The cabinet installers worked a full week installing all my cabinets. This is the bar area in the basement. I think the black contrast really sets it off. Love it...
Tags
Silver Lake
Subscribe to:
Post Comments (Atom)

















No comments:
Post a Comment